St John of God, Geelong

TGM provided structural and civil engineering, survey and planning  services for the design of a 4 storey plus 3 level underground carpark  extension to existing hospital. TGM’s planning team provided the client with initial planning advice, preparation and lodgement of application through to obtaining the permit and subsequent amendments. 

 The scope of the redevelopment included:

• 64 new inpatient beds with built ‘shell space’ for future inpatient bed expansion

• 2 new theatres and 1 catheter laboratory

• Establishment of new emergency medicine service including 8 patient bays and 4 short stay rooms

• A new rehabilitation service inclusive of a hydrotherapy pool and two gym rooms

• New consulting suites - A 6 level stand alone consulting suite building, located on the corner of Moorabool and Myers Streets. This building is a signature element of the development

• A tunnel link between basement level 1 carpark and the consulting suite building

• Refurbishment of existing space for education, administration, support services and operating suite expansion

• Additional on site car parking – 3.5 levels of basement car park with direct vehicle and pedestrian access from the main entry.

 

Project Team

Darren Trigg

General Manager - Business Development

Alan Barham

Group Manager – Structural Engineering

Jeffrey Tribe

Principal Structural Engineer

Nathaniel Jobse

Senior Structural Engineer

James Liversage

Manager – Structural Engineering

Kyle Bennett

Manager – Structural Engineering

Chris Marshall

Group Manager – Town Planning

David Rendle

Licensed Surveyor

Joanne Preece

Senior Town Planner

Related Projects

Contact us to discuss how TGM can assist on your latest project.