Mt Mercer Wind Farm

TGM’s survey division provides expert surveying services on some fascinating and complex projects. TGM’s survey team is currently providing services on the Mt Mercer Wind Farm in Western Victoria. The proposed 64 wind turbines will produce enough energy to power the City of Ballarat.

TGM’s survey team is working with Downer EDI who are building the roads and setting up all the hardstand and foundations for the wind turbines. REpower Australia will supply and install the turbines.

The project will require ongoing survey support over a 14 month period, utilising staff and expertise from both the TGM Ballarat and Geelong offices. Wind farm projects require both GPS survey for efficient location of turbines and hardstand area and traditional survey to ensure a high accuracy of set out work. Quality control for the turbines tower bases and hardstand is to be provided by TGM and will be documented on QA sheets developed in-house.

To read more about this project and TGM's involvement, click the below link.

http://www.xyht.com/surveying/capturing-the-wind/ 

http://www.trimble.com/technologyandmore/i1-2016/FLASH/index.html

Project Team

Related Projects

Contact us to discuss how CardnoTGM can assist on your latest project.