Ararat Wind Farm

TGM provided surveying and engineering services on the 75 turbine Ararat Wind Farm project. Over an 18 month period, TGM’s survey department had 12 different sub projects under the overall project umbrella. Survey works included:

  •  Survey for planning, civil design refinement and over-dimension delivery routes
  •  Set out for access tracks, civil construction work and substation infrastructure
  •  Progress volume reporting
  •  Machine control data conversions
  •  Volume tracking for progress claims
  •  Lidar validation
  •  QA checking and reporting for foundations and tower section installations

TGM’s civil engineers provided engineering design services for the Sandy Lane and Pyrenees Highway intersection upgrades which included preparation of a functional layout plans and detailed design. TGM’s structural engineers provided site inspections and documentation and report for a gas main crossing.

 

Project Team

Nathan Farrell

Manager - Surveying

Alan Barham

Group Manager – Structural Engineering

Joe Lynch

Manager – Civil Engineering

James Liversage

Manager – Structural Engineering

Related Projects

Contact us to discuss how TGM can assist on your latest project.