Melbourne to Geelong Interconnector Project

The $138 million MGI Project is a joint  initiative by Barwon Water and Melbourne Water to address Geelong’s short term water problems.  TGM has provided their surveying expertise throughout the entire 55km pipeline for both design and construction stages of the project.  The services provided includes the establishment of a survey control network, the verification of LIDAR topographical data, detailed feature surveys of critical areas, service verification surveys, title boundary definition and providing cadastral easement plans.